Dawntrail content

Hydrofication Station Construction Support (Auxesia)

From Final Fantasy XIV Online Wiki
Jump to navigation Jump to search

Hydrofication Station Construction Support

Location
Auxesia (X:25.5, Y:30)
Level
1
Duration
20 min
Experience
Experience 100% to next level
Gil
Gil 2,000
Patch
7.51
Links
GT TC

We are ready to begin construction of the hydrofication station. Retrieve parts from a supply crate, assemble them at a fabrication station, then perform necessary upgrades.

— In-game description

Hydrofication Station Construction Support is a level 1 FATE spawned in Auxesia.

Rewards

Steps

  • Retrieve parts from a supply crate.
  • Assemble parts at a fabrication station.
  • Perform upgrades at an upgrade mounting point.

Notes

Similar to other Cosmic Exploration project FATEs, this is a limited-time FATE per server.

This is the second of two joint projects. It starts 5 minutes after completing the previous part, Energization Station Construction Support.

This mission completes Development Log 4 in the Auxesia Infrastructure Index.