Dawntrail content

Energization Station Construction Support (Auxesia)

From Final Fantasy XIV Online Wiki
Jump to navigation Jump to search

Energization Station Construction Support

Location
Auxesia (X:26.2, Y:30.7)
Level
1
Duration
20 min
Experience
Experience 100% to next level
Gil
Gil 2,000
Next FATE
Hydrofication Station Construction Support (Auxesia)
Patch
7.51
Links
GT TC

We are ready to begin construction of the energization station. Retrieve parts from a supply crate, assemble them at a fabrication station, then perform necessary upgrades.

— In-game description

Energization Station Construction Support is a level 1 FATE spawned in Auxesia.

Rewards

Steps

  • Retrieve parts from a supply crate.
  • Assemble parts at a fabrication station.
  • Perform upgrades at an upgrade mounting point.

Notes

Similar to other Cosmic Exploration project FATEs, this is a limited-time FATE per server.

This is the first of two joint projects. The second part, Hydrofication Station Construction Support, begins 5 minutes after completing this project.