Excessive Force
Jump to navigation
Jump to search
Excessive Force
- Quest giver
- Suppression Node
- Location
- Azys Lla (X:19.0, Y:12.3)
- Level
- 59
- Required quest
- Systematic Exploration
- Experience
- 13,455
- Gil
- 545
- Patch
- 3.0
“The Allagan Suppression Node is attempting to initialize a system test.
— In-game description
Steps
- Slay Clockwork Paladins.
- Slay Clockwork Engineers.
- Report to the Suppression Node.
Journal
- The Allagan suppression node is attempting to initialize a system test.
- The Allagan suppression node needs to confirm the effectiveness of its citizen compliance assurance subsystem. Put the subsystem through its paces by attempting to destroy three clockwork engineers and three clockwork paladins.
- The test has been completed. Return to the suppression node to confirm the results.
- The suppression node seems to view your survival as a failure of the subsystem and recommends and upgrade of the infrastructure.
Dialogue
Accepting the Quest
Suppression Node: Initializing system test. <beep> <beep> Test subject not found. Aborting... Initializing system test. <beep> <beep> Test subject not found. Aborting... Initializing system test. Suppression Node: Congratulations on being selected for system testing. Please verify the effectiveness of the citizen compliance assurance subsystem by approaching clockwork engineers and clockwork paladins and demonstrating non-compliant behavior. Suppression Node: Please verify...<buzzzzzz>...assurance subsystem by approaching clockwork... <buzzzzzz> (Optional) Suppression Node: <buzzzzzz> ...non-compliant behavior. Please verify the effectiveness of the citizen compliance assurance subsystem by approaching clockwork engineers and clockwork paladins and demonstrating non-compliant behavior. Please verify... <buzzzzzz>
Reporting to the suppression node
Suppression Node: Thank you for participating in the citizen compliance assurance subsystem testing program. Test subjects neutralized... ZERO. Subsystem performance... UNSATISFACTORY. Suppression Node: Upgrade of suppression infrastructure is recommended to ensure optimal citizen conformance.